nlendeplruuk +48 15 822 98 52 Pon- Pt 08:00 - 16:00 ul. Mechaniczna 5, 39-400 Tarnobrzeg mail@tarkon.pl projekt@tarkon.pl
CustomerBanimex
ScopeProduction, delivery, installation
Carrying capacity50 tons

Assembly photos:

Construction Description:

The new, comprehensively equipped structure carries the provincial road DW 881 of technical class “G” over the Wislok River. The bridge has a 7.0-meter-wide roadway, as well as 2.90-meter-wide bicycle lanes on both sides with pedestrian traffic. Safety on the facility is enhanced by railings and guardrails. The constructed object is illuminated.

The bridge replaces a worn-out structure that, due to insufficient load-bearing capacity and geometric parameters, did not meet current requirements and transportation needs. The bridge was built in a changed location and, together with access roads, forms a new section of the provincial road. Making it accessible to vehicular traffic made it possible to demolish the old bridge and complete the task.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.